Uptown Chicago 8-unit Roof Ventilation and Repair Plan - December 2021

North Clark, Uptown, Chicago - Roof Venting and Roof Repair/Replacement Proposal/Staging Plan - 12-21-21
A: Mid-tier Re-Roof
B: Whole Roof Tear Off
C: Pitch pan re-configuration
D: Rear Stairwell / Elevator Shaft
E: Front Stairwell Roof Repair
A: Mid-Tier Re-Roof and Ventilation
Install WickRight Roof Vent, this process of opening the perimeter of the roof allows for a direct inspection of the roof trusses prior to replacing the field of the mid-tier roofs.
1. Remove field of the mid-tier roofs: install 1/2” high density Polyiso board screwed to the plywood sheathing
2. Install “Liberty” brand base sheet (this self-adhered base sheet is the thickest material available)
3. Install 1 layer of GAF Rubberoid modified bitumen or equal
4. Install counter flashing the new metal coping/ roof system to flash roof termination.
B: Main Roof
Install WickRight Roof Vent along the perimeter of the entire main roof system and replace the roof membrane.
- East access door solution:
- Rework east access door at front stairwell
- Remove existing door
- Build up the threshold, install roofing through the opening Install pan flashing
- Install a shorter, more narrow door to accommodate the existing conditions. This is the only way to successfully flash and waterproof the door opening.
2. Rework middle scupper
C: Pitch pans and roof penetrations
- Disconnect AC units
- Exhaust pipes: these pipes are too close together. The pipes will be cut and reconfigured above the roof line, yet below the new elevated roof termination.
- Electrical lines: all power will be rerouted into a pull box. This becomes a common junction box from which we can relocate new electrical wires without disconnecting the existing. Installing this box enables us to relocate the air-conditioning condensers in the best place possible.
To learn more about this project, give Bob Kelly a call at 312-720-1467.