Uptown Chicago 8-unit Wet Masonry Building - Flat Roof Ventilation & Repair Plan - December 2021

WickRight Roof Ventilation and Repair diagram color coded to help HOA understand types of repairs recommended by area

North Clark, Uptown, Chicago - Roof Venting and Roof Repair/Replacement Proposal/Staging Plan - 12-21-21

A:  Mid-tier Re-Roof

B:  Whole Roof Tear Off

C:  Pitch pan re-configuration

D:  Rear Stairwell / Elevator Shaft

E:  Front Stairwell Roof Repair


A: Mid-Tier Re-Roof and Ventilation

Install WickRight Roof Vent, this process of opening the perimeter of the roof allows for a direct inspection of the roof trusses prior to replacing the field of the mid-tier roofs.


1.       Remove field of the mid-tier roofs:  install 1/2” high density Polyiso board screwed to the plywood sheathing

2.       Install “Liberty” brand base sheet (this self-adhered base sheet is the thickest material available)

3.       Install 1 layer of GAF Rubberoid modified bitumen or equal

4.       Install counter flashing the new metal coping/ roof system to flash roof termination.


B: Main Roof

Install WickRight Roof Vent along the perimeter of the entire main roof system and replace the roof membrane.


  1. East access door solution:
  • Rework east access door at front stairwell
  • Remove existing door
  • Build up the threshold, install roofing through the opening Install pan flashing
  • Install a shorter, more narrow door to accommodate the existing conditions. This is the only way to successfully flash and waterproof the door opening.


2. Rework middle scupper


C: Pitch pans and roof penetrations

  1. Disconnect AC units
  2. Exhaust pipes:  these pipes are too close together. The pipes will be cut and reconfigured above the roof line, yet below the new elevated roof termination.
  3. Electrical lines: all power will be rerouted into a pull box. This becomes a common junction box from which we can relocate new electrical wires without disconnecting the existing. Installing this box enables us to relocate the air-conditioning condensers in the best place possible.


To learn more about this project, give Bob Kelly a call at 312-720-1467.

Histor
June 29, 2026
Historic Hyde Park Home, WickRight Reverses Issues Caused by Repointing with Type N Mortar - Evaluation 2021
Brick building with rear balconies, overhead view marked with color coded repair boxes
June 25, 2026
2021 Proposal brick and split face block building repair includes Roof Replacement and WickRight Vented Drip Edge and Roof Vent to dry parapets and keep them dry.
Repair diagram color coded for clarity on which repair types are recommended in each area
June 24, 2026
Color coded WickRight repair recommendations for venting parapets, Recommendation: Vented Drip Edge under capstones and custom venting for front elevation.
Wet building parapet, failing masonry, rusty lintel, leaking door curb
June 23, 2026
Uptown 8-unit masonry building with dangerous balcony connections - proposal July 17, 2019
Stairwell building parapet with corbels and leaking junction of metal roof and modified bitumen roof
June 8, 2026
WickRight custom designed repair of Stairwell Building, aka Dog House, parapets with decorative corbels and leaking junction of metal roof and modified bitumen roof.
WickRight craftsman installs custom vented cornice
June 1, 2026
Attractive and functional custom designed vented metal cornice protects and vents leaking stone cornice in Roscoe Village, Chicago
Efflorescence on brick building indicates 
moisture intrusion from the parapet.
May 26, 2026
20-year old masonry building in Chicago with Renaissance Stone Cornice, window and door details, requires 3 Phase repair plan to mitigate moisture intrusion.